BagCrete

Deck Footing Concrete Calculator

Six 12" footings, 48" deep, come to 5.5 × 80 lb bags each, about 33 bags total. Set your footing count, diameter and depth below. Each footing rounds to the nearest half bag because you pour them one hole at a time.

▦ Bags per footing set
bags total
Per footing
Total concrete
Estimated cost
You'll be hauling

Tube volume (minus an embedded post) plus any bell base, rounded to a half bag per footing. Bell math assumes a 12" bell height added below the tube; your form prints its own. Depth is the concrete column, not the wood post above it.

⚠ You're at bags, a cubic yard or more of mixing. Price a ready-mix short load before you commit the weekend.

Tube forms, flared bell bases, post bases and a mixing tub for the pour: deck footing forms and hardware on Amazon

This counts concrete, it does not design the footing. How many footings your deck needs, how wide each one is, how deep it goes, and whether it wants a flared bell base are structural calls that depend on the load carried by each post (its tributary area), your soil, and your local frost line. Those come from your building department or a structural engineer. Use this to buy the right amount of mix once the footing plan is stamped, not to size the footings yourself.

Bags per footing, at a glance

FootingVolume (48" deep)80 lb bags each
8" footing1.40 ft³2.5
10" footing2.18 ft³4
12" footing3.14 ft³5.5
14" footing4.28 ft³7.5
16" footing5.59 ft³9.5

These are straight tubes with no post deduction and no bell, at 48" deep. Shorter or deeper footings scale straight with depth. Working form by form instead of by project? The sonotube calculator is the same math per tube: a sonotube is the cardboard form, a footing is the whole below-grade pier you pour into it.

How many footings does a deck need?

That is set by your beam and joist spans, not the deck's square footage, so treat the counts below as a starting point and confirm them against a span table or your plans. Footing bags assume the 12" × 48" default above.

Deck sizeTypical footings80 lb bags (12" × 48")
8 × 8 ft317
10 × 10 ft317
12 × 12 ft317
12 × 16 ft422
12 × 20 ft422
16 × 20 ft633

Once the footings cure and the posts are up, size the slab or pad portions with the slab calculator and check bag yields on the yields chart. If the whole set of footings adds up past a cubic yard, run bags vs ready-mix first.

Pouring footings that pass inspection

FAQ

How many bags of concrete per deck footing?

A 12" tube footing 48" deep takes 5.5 × 80 lb bags. Smaller 8" footings run about 2½ bags each; 16" footings about 9½. Add a flared bell base or embed the post and the count climbs. The tool rounds each footing to the nearest half bag because you batch and pour them one hole at a time.

What size sonotube for a deck footing?

Common practice is a tube about 3× the post width, so 10" or 12" tubes for 4×4 and 6×6 posts, but the real number is a bearing-area calculation from the load on that post and your soil. Your building department sets it. The sonotube calculator is the form-by-form version of this tool if you already know your tube size and height.

How deep do deck footings go?

Below your local frost line, which runs from about 12" in the mild South to 48" or more across the northern tier. Frost depth, footing diameter, and whether you need a flared base are load-and-soil calls your building inspector or a structural engineer makes, not a rule of thumb. Pull the permit and get the number before you dig.

Do deck footings need a flared or bell base?

Sometimes. A bell (a wider frustum at the bottom, like a Bigfoot form) spreads the post load over more soil so the footing does not punch down in soft ground. Whether you need one, and how wide, comes from the tributary load on that post and the soil bearing capacity. Switch the flared-base option on to add that volume once an engineer or your code official has specified it.

Should I mix bags or order ready-mix for footings?

Footings are one of the better cases for bags: each hole is a small, separate pour, so cold joints between batches are not an issue the way they are on a monolithic slab. Once the total climbs past about a cubic yard (roughly 45 × 80 lb bags), price a ready-mix short load against the bags and the mixing day.